With a whole lot of faith, we relied on the math and just cut the entire gable wall using Mark's method... then did a test layout on the living room floor (minus the headers)... so far so good!
Sam lifted nearly the entire gable wall, piece by piece, up to Brad on the 2nd floor.
Lifting the wall...
Obviously very pleased that the math worked... the wall went together perfectly.
First lunch in the kids room! Amazingly warm for late November... we are dreaming of being completely done next summer and wondering why we didn't plan for a second floor porch.
Kids can only work for a little while before they start going crazy and goofy... yes, that is our lunch all over the ground. Does Ben look guilty? Sam is alive and well, in case you are wondering.
Two peas in a pod...
The boys thought Erik would appreciate our new wrestling ring:
And by Sunday afternoon, one half of the tower is up:
No comments:
Post a Comment